Lesson 5: Keeping flood water out
Unit overview - Previous: Climates around the world
Back to the grade 3 year plan
Goal
Children learn that people cannot stop weather hazards but can make the harm
smaller. They test two model flood barriers around a model house, keeping the
water the same, and make a claim about which design works better, giving
evidence from their test.
Length
About 40 minutes: Opening 5, Main activity 25, Discussion 5, Closing check 5.
The one-to-one assessment (see Assessment in the
unit overview)
happens during this lesson or the following week.
Materials
- For each group of 4-5: a shallow plastic tray or box about 30 cm long with a
rim at least 5 cm high; damp washed play sand; a small wooden block or a
plastic brick (the "house"); squares of paper towel about 5 cm across (one
under the house for each pour, so at least three per group); a plastic jug
with 200 ml of water marked on it; a pouring cup; a lump of latex-free
modelling clay about the size of a tennis ball; eight lolly sticks; a
book or a block about 3 cm thick to tilt the tray.
- A few spare paper towel squares.
- A results chart on the board with three rows (no barrier, lolly-stick wall,
clay wall) and three columns for the paper towel: dry, damp, wet.
- Three design picture cards: a flood barrier (a low wall in front of a door
and a row of sandbags), a lightning rod on a roof with a wire to the ground,
and a roof tied down with strong straps.
- Aprons, cloths and a bucket for wet sand.
- For blind or low-vision children: the child feels the paper towel square
after each pour (dry, a little damp, wet) and feels the barriers before
pouring.
Steps
Opening (5 min)
Tell families beforehand what the lesson is about. Any child may choose to be
a helper or do only the tray test, with no reason needed.
Say calmly: "Sometimes weather is so strong that it can cause harm: very heavy
rain can make rivers or streets flood, strong winds can lift roofs, and
lightning can strike buildings. We call these weather hazards. People
cannot stop the weather. But engineers design things that make the harm
smaller. Today we test designs that keep flood water away from a house."
Do not ask children about their own homes or experiences.
Main activity (25 min)
Groups build a sand "town" in one half of the tray: a flat, low area with the
house standing on a paper towel square in the middle. The "river" end is the
other, empty end of the tray. Tip the tray up slightly at the river end
(rest that end on the book or block) so that water poured there runs down towards the
house.
- No barrier (5 min). Pour 200 ml of water slowly from the cup into the
river end. Wait 30 seconds. Lift the house: is the paper towel dry, damp or
wet? Record it. Put a new dry paper towel square under the house and smooth
the sand.
- Lolly-stick wall (8 min). Push the eight lolly sticks side by side into
the sand between the river and the house, as a wall. Pour the same 200 ml
the same way, from the same place, at the same speed. Wait 30 seconds. Check
the paper towel and record. Remove the sticks, change the paper towel and
smooth the sand.
- Clay wall (8 min). Roll the clay into a long sausage and press it into
the sand between the river and the house as a wall, pressing it down so
there are no gaps underneath. Pour, wait, check and record as before.
- Class chart (4 min). Each group adds its three results to the class
results chart.
Discussion questions (5 min, with answers)
- "What did we keep the same each time?" (The amount of water, 200 ml; where
and how fast we poured; the house; the tray and its tilt; how long we
waited.)
- "Which design kept the house driest? How do you know?" (Usually the clay
wall; any answer that matches the chart, with the paper towel as evidence.)
- "Make a claim: 'The ... wall is better because ...'." (For example, "The clay
wall is better because the paper towel stayed dry, and water got through the
gaps between the lolly sticks." Any claim with evidence from the chart.)
- "Did the barrier stop the rain?" (No; it kept water away from the house. It
made the harm smaller.)
- Show the other two design cards. "What hazard does each one make less
harmful?" (The lightning rod: lightning; it gives lightning a path to the
ground through a wire instead of through the building. The strapped roof:
strong wind; it keeps the roof from being lifted off.)
Closing check (5 min, with answers)
Children answer by saying, signing or pointing:
- "What did the barrier protect?" (The house.)
- "Which hazard does a lightning rod help with?" (Lightning.)
- "Did we change the amount of water between tests?" (No; it was always
200 ml.)
Then use the one-to-one assessment in the unit overview.
Vocabulary
hazard, flood, barrier, design, engineer, claim, evidence, lightning rod,
fair test
Differentiation
- More help: test only no barrier and the clay wall; an adult pours.
- More challenge: design a third barrier with the same materials (for
example clay pressed along the bottom of the lolly sticks) and test it the
same way; or say one good and one bad thing about each design (for example,
clay works well but takes longer to build).
- Children who prefer not to touch wet sand can pour, time the 30 seconds or
record.
Safety
- Aprons on. Wipe spills straight away so the floor is not slippery.
- Sand stays in the trays and away from faces; wash hands afterwards.
- Check for latex and wheat allergies before using modelling clay.
- Talk about hazards calmly; no frightening pictures or stories. Any child may
step out of the talk. Never ask about children's homes or experiences.
Teacher notes and misconceptions
- Some children think barriers stop the rain itself. Stress that the rain
still falls; the barrier changes where the water goes.
- The lolly-stick wall usually leaks between the sticks and underneath; that
is a useful result, not a failure.
- If results differ between groups, say so honestly: the sand, the tilt or the
pouring may not have been quite the same. One test is not proof.
- In grade 2 the class protected a sand hill from water. Here the new idea is
making a claim about which design is better, using evidence.
- The tray is a model. Real flood barriers are much larger, and real water
pushes much harder.